Training and Tracking Leather Dog Leash - Super Long Lead

$63.99

Weight:

SKU:

Product type:

Vendor: Dogsports4u

Collections: Leashes, SALE

Tags:

Availability:

Maximally Comfortable Leather Tracking Leash

Key features of this Dog Leash:

  • 100% full grain latigo leather
  • Brass high quality snap hook
  • Handmade
  • Very soft 10 mm wide thick leather

Intended use of this Dog Leash:

  • Tracking
  • Walking
  • Training
  • Patrolling

Sizes available:

  • 13 ft (4 m)
  • 20 ft (6 m)
  • 27 ft (8 m)
  • 33 ft (10 m)

Available colors:

  • Black
  • Brown
Related Products

Rubberized Non Slip Tracking leash 10 M (33 ft)

Colorful collection of rubberized 10 m (33ft) leashes.  Not slippery when wet, easy maintenance -...

Colorful collection of rubberized 10 m (33ft) leashes.  Not slippery when wet, easy maintenance - track, wash, dry, track again.  Light and sturdy. Match yours to your tracking flags!  

$60.99 $60.99 (10 variants)

Rubberized Non Slip 6 ft Leash with handle

Colorful collection of rubberized 8" -6ft  tabs and leashes.  Not slippery when wet, easy mainten...

Colorful collection of rubberized 8" -6ft  tabs and leashes.  Not slippery when wet, easy maintenance - train, walk, wash, dry, and do it again.  Light and sturdy.  COLORS VARY

$16.99 $28.99 (4 variants)

Dominant Dog Leather Collar Leash Combination

Made in Europe, this combo leash and dominant dog collar choke collar with stopper is unique!  No...

Made in Europe, this combo leash and dominant dog collar choke collar with stopper is unique!  Now you have complete control for walking and training your reactive or dominant dog. Dominant combo leather leash / choke collar dimensions: 6ft (180 cm) long - from end to end 1/2 inch (13 mm) wide 1/5 inch (4.5 mm) thick Key Features of this walking / training leash/ collar combo: Best raw cow hide 100% full grain leather Best polished brass snap hook Smoothed, waxed and rounded edges Hand-sti...

$40.99 $40.99 (2 variants)

Rubberized Soft Grip Dog Leash

I-Grip High Quality Training Dog Leash Key features of this Dog Leash: strong nylon material...

I-Grip High Quality Training Dog Leash Key features of this Dog Leash: strong nylon material rubber lines for better grip brass snap hook  rust and corrosion resistant hardware 3/4 inch (20 mm) in width Intended use of this Dog Leash: walking training tracking Sizes available 15 ft (500cm) 33 ft (1000cm) Available colors: black - 15 ft  blue - 15 ft and 33 ft mixed multi colors

$18.99 $58.99 (7 variants)

Leather leash for training and trials

Key features of this Dog Leash: 100% full grain latigo leather brass high quality snap hook ...

Key features of this Dog Leash: 100% full grain latigo leather brass high quality snap hook handmade 3/4 inch (20 mm) wide smooth waxed edges leather rust and corrosion resistant hardware gold color fittings exquisite braided decoration super durable Intended use of this Dog Leash: walking training dog show Sizes available: 2 Ft (60 cm) 3 Ft (90 cm) 4 Ft (120 cm) 5 Ft (150 cm) 6 Ft (180 cm) Available colors: black brown    

$32.99 $43.99 (5 variants)

10m-33ft Fine Leather Tracking leash

This leash is made of the finest leather, it is soft and durable, for the weather when biothane s...

This leash is made of the finest leather, it is soft and durable, for the weather when biothane simply won't do, this leash will work well.  It will quickly become your favorite tracking line, like it became ours!

$163.99 $182.99

Walking and Tracking Leather Dog Leash of Handcrafted Design

Classy Multifunctional Leather Dog Leash Key features of this Dog Leash: 1/2 inch (12 mm) wi...

Classy Multifunctional Leather Dog Leash Key features of this Dog Leash: 1/2 inch (12 mm) wide best leather best brass snap hook floating brass O-ring on the handle smoothed & rounded edges Intended use of this Dog Leash: tracking walking training patrolling dog show Sizes available: 1 ft (30 cm) 2 ft (60 cm) 3 ft (90 cm) 4 ft (120 cm) 5 ft (150 cm) 6 ft (180 cm) 7 ft (210 cm) Available colors: black brown

$30.99 $34.99

Multifunctional 7 way All Weather Police Nylon Dog Leash

Multifunctional All Weather Police Nylon Dog Leash Key features of this Dog Leash: High qual...

Multifunctional All Weather Police Nylon Dog Leash Key features of this Dog Leash: High quality durable nylon Brass high quality snap hooks and rings 2 ply nylon heavy duty stitched Rust and corrosion resistant hardware Intended use of this Dog Leash: Walking Training Tracking Patrolling Over 7 different activities with same leash Sizes available: 7ft (210 cm) Available colors: black   7 ways to use this Leash: Over the shoulder Leash:Bring handle end over your should...

$33.99 $38.99

Soft Show Leather Leash

This Braided Black Leather Dog Leash with brass fittings will manage with your dog, protect your...

This Braided Black Leather Dog Leash with brass fittings will manage with your dog, protect your hands and give you a lot of pleasure. It combines everything: comfort, safety, reliability, awesome look, best design.  Extra long, 8.5 ft is perfect for walking, hiking, beginning of tracking. 3/8"x 8.5 ft

$50.99 $57.99

Softly Stitched Leather Dog Leash

Key features of this Dog Leash: brass snap hook 3/4 inch (20 mm) wide smooth leather hand st...

Key features of this Dog Leash: brass snap hook 3/4 inch (20 mm) wide smooth leather hand stitched handle 100% full grain genuine leather strong nylon threads excellent design super soft in touch Intended use of this Dog Leash: walking training patrolling tracking Sizes available: 1 ft (30 cm ) 2 ft (60 cm ) 3 ft (90 cm ) 4 ft (120 cm ) 5 ft (150 cm ) 6 ft (180 cm ) 7 ft (210 cm ) Available colors: black brown

$35.99 $43.99 (3 variants)